• Huaren Easy Construction Asian Paint Waterproof
  • Huaren Easy Construction Asian Paint Waterproof
  • Huaren Easy Construction Asian Paint Waterproof
  • Huaren Easy Construction Asian Paint Waterproof
  • Huaren Easy Construction Asian Paint Waterproof
  • video

Huaren Easy Construction Asian Paint Waterproof

  • Huaren
  • Guangdong
  • 30 Days
  • 50000 Tons/Years
Waterproof concrete coatings also can’t be applied to painted walls. This sealant is for concrete and other masonry and must be applied with a special brush. Waterproofing interior paint is applied in a thick layer on top of other sealers for added waterproofing protection.

           Please contact us for details   

Most waterproofing is an exterior coating, on the positive side (exterior) of the wall, although another option is to use an admixture that makes the concrete itself impervious to water and water vapor.

  • All waterproofing and dampproofing starts with a clean, smooth wall surface. Loose particles should be washed or brushed off, protrusions removed, and any existing cracks repaired. Seam tape can be used to bridge cracks. New concrete should be allowed to cure and dry out for 7 to 14 days, although some spray-on membranes can be applied to green concrete.

  • Dampproofing is a relatively simple treatment of asphaltic material that is sprayed on or applied with brush or roller. Small jobs are easily handled by builders although many will hire a specialty waterproofing contractor for larger projects.

  • True waterproofing requires more time and effort. The outside of the wall is covered with an impermeable coating that extends down to the drain. One method employs sheets fastened to the wall and lapped adequately at seams, both vertical and horizontal. Another method uses several layers of sprayed-on seamless material built up to the thickness specified by the manufacturer.

  • Some of the spray-on treatments require a priming coat and then one or more final layers of a liquid-rubber, elastomeric coating built up to usually a minimum 60-mil thickness. These coatings dry in about 60 minutes to form a seamless barrier which is resistant to puncture.

  • The International Residential Code specifies that the membrane must extend from the top of the footing to the finished grade, but a better approach is to take the membrane over the footing and down into the drain trench.


Related Products

Get the latest price? We will reply as soon as possible (within 2 hours)