• Durable 2 Components Epoxy Floor Coating
  • Durable 2 Components Epoxy Floor Coating
  • Durable 2 Components Epoxy Floor Coating
  • Durable 2 Components Epoxy Floor Coating
  • video

Durable 2 Components Epoxy Floor Coating

  • HUAREN
  • China
  • 7 days
  • 20,000MT
Durable 2 Components Epoxy Floor Coating advantage: That is a two-component solvent based anti-slip epoxy finish. It can be applied in the cold and moist environment, especially in the wet and humid areas, for example foodstuff factory where anti-slip performance is necessary. The coating is a hard,wear-resistant wrinkle surface, but still easy to clean. Wide range of colors for your choice.

           Please contact us for details   

Advantages:

1. Beautiful, seamless, dustproof and easy to clean

2.Have good bonding with the solid base, small shrinkage with good abrasion resistance and durability

3. Have good corrosion-resistance to the general chemicals.

4. Nice appearance, rapid construction and economy.

5. Applicable to the moderate load

 

Application instructions:

Surface preparation

Correct substrate preparation is critical for optimum performance. Surface should be sound, clean, dry and free from loose particles,oil,grease,and other contaminants.

Primer

Prepare a barrel, pour paint and hardener Stir the mixture well and then apply it with roller or trowel. The reference consumption is 0.15kg/m².The main purpose of this primer is to seal the substrate completely and avoid air-bubbles in the body coat. A second coat may be required depending on the oil absorption condition of substrate. The recoat time is about 8 hours.

Inspection standard for the primer: even film with certain brightness.

Undercoat

Mix paint and hardener then add quartz powder (1/2 of the mixture of A and B) into the mixture, stir it well and apply with trowel. The consumption quantity of A and B is 0.5kg /sqm. You can do it one coat at one time or two coats at two times. In the second case, the application interval is about 8 hours at 25 degrees. Sand the first layer, clean it and then apply the second layer. After the whole application, wait another 8 hours, grind it, clean the sanding dust and then continue the next procedure.

Inspection standard for the undercoat: Non-sticky to hand, no softening, no nail print if you scratch the surface

Top coat

Mix paint and hardener and then apply the mixture with spatula. The consumption quantity is 1.0kg/sqm.

Maintenance

5-7 days. Don’t put the floor into use or wash it with water or other chemicals.

epoxy paint

Clean up

Clean tools and equipments first with paper towels, then clean them with solvent before the resin hardens. Health and safety information It contains certain chemicals which can cause skin irritation. Wear gloves, masks while handling the product, washing thoroughly after handling. Should skin contact occur, wash immediately with soap and water. During application and curing in closed rooms, adequate fresh air ventilation must be provided. Keep away from open flames including welding. In case of accidental eye contact, wash with a large quantity of water and immediately seek medical advice. For detailed health, safety, environment recommendations, please consult and follow the instruction on the product material safety data sheet

 

Caution

1.The operating environment should be ventilative and should keep away from fire. Closely sealed after use.

2.Avoid eye contact, in case of contact, wash with plenty of water and get medical attention immediately.

3. If contact skin, wrap with clean cloth or paper, and wash it with water and soap.

4.Keep away from children.

5. Please take a trial before application to avoid usage mistake.

 

 

FAQ

Q1: What should I do to the concrete floor before apply epoxy resin floor paint?

A: Before applying epoxy floor paint, be sure to make the concrete floor smooth and flat, the surface must be clean,sound hard and free from loose particles,oil,grease and other contaminants. If it is old floor with cracks,holes,joints, it is required to repair and till dry.

 

Q2: Is there any special requirement on the substrate concrete condition?

A: Yes, The concrete strenght must be above >C25 ;

Flatness: the maximum altitude difference of 2M running rule must be <3mm

The moisture content of the base must be <4%.

 

Q3: What is the requirement on the environment during application of epoxy floor paint?

A: 1.The temperature should be no less than 10 C;

  2.The moisture of air should be below 85%

  3.Make sure the room is well ventilated during application.

 

Q4: How many layers of epoxy paint is it in your paint system?

A: This is flexible. If your floor is new and smooth in good condition, generally 3 layers of epoxy paint would be enough;While if your floor is old with cracks,joints,holes,etc,it is suggested to apply 4 layers of epoxy paint.

 

Why Choose us?

1.Rich experience in Transport of Chemical liquid goods.

2.Response timely with professional workable advise.

3.Wide range of chemical product provided,your best one-step purchase choice.

4.site Instruction by engineer.

5.OEM Service Provided.

6.Free Sample For Test.



Related Products

Get the latest price? We will reply as soon as possible (within 2 hours)