• Concrete Floor Paint Self Leveling Epoxy Paint
  • Concrete Floor Paint Self Leveling Epoxy Paint
  • Concrete Floor Paint Self Leveling Epoxy Paint
  • Concrete Floor Paint Self Leveling Epoxy Paint
  • video

Concrete Floor Paint Self Leveling Epoxy Paint

  • HUAREN
  • China
  • 7 days
  • 20,000MT
Concrete Floor Paint Self Leveling Epoxy Paint advantage: That is a two-component solvent based anti-slip epoxy finish. It can be applied in the cold and moist environment, especially in the wet and humid areas, for example foodstuff factory where anti-slip performance is necessary. The coating is a hard,wear-resistant wrinkle surface, but still easy to clean. Wide range of colors for your choice. Product Description

           Please contact us for details   

Advantages

1. Seamless, dust-proof and easy to clean

2. Solvent-free and environmental

3. Dense corrosion-resistance surface

4. Bright &smooth surface

 

Technical Data:

Drying time:

Touch dry: 6 hours, Hard dry: 2 days

Compressive strength (Mpa):

80

Impact resistant strength (Kgcm):

30

Flexural strength (Mpa):

40

Adhesive force grade:

1

Pencil hardness (H):

3

Abrasion resistance(750g/1000r, zero gravity, g)

0.026

Service life:

8-10 years

Recommended Consumption:

Primer: 0.15kg/square meter

Putty layer: 0.2kg/square meter

Finish: 0.4kg/square meter

Quartz Powder: 0.4kg/square meter

 

Where to Use:

It is mainly used for the non-dusty and non-bacteria areas like pharmaceutical factory, hospital, precision machinery, electronic factory, etc.

 

Application instructions:

epoxy paint

Surface preparation

Correct substrate preparation is critical for optimum performance. Surface should be sound, clean, dry and free from loose particles,oil,grease,and other contaminants.

Primer

Prepare a barrel, pour paint and hardener Stir the mixture well and then apply it with roller or trowel. The reference consumption is 0.15kg/m².The main purpose of this primer is to seal the substrate completely and avoid air-bubbles in the body coat. A second coat may be required depending on the oil absorption condition of substrate. The recoat time is about 8 hours.

Inspection standard for the primer: even film with certain brightness.

Undercoat

Mix paint and hardener then add quartz powder (1/2 of the mixture of A and B) into the mixture, stir it well and apply with trowel. The consumption quantity of A and B is 0.5kg /sqm. You can do it one coat at one time or two coats at two times. In the second case, the application interval is about 8 hours at 25 degrees. Sand the first layer, clean it and then apply the second layer. After the whole application, wait another 8 hours, grind it, clean the sanding dust and then continue the next procedure.

Inspection standard for the undercoat: Non-sticky to hand, no softening, no nail print if you scratch the surface

Top coat

Mix paint and hardener and then apply the mixture with spatula. The consumption quantity is 1.0kg/sqm.

Maintenance

5-7 days. Don’t put the floor into use or wash it with water or other chemicals.

 

FAQ

Q1: What should I do to the concrete floor before apply epoxy resin floor paint?

A: Before applying epoxy floor paint, be sure to make the concrete floor smooth and flat, the surface must be clean,sound hard and free from loose particles,oil,grease and other contaminants. If it is old floor with cracks,holes,joints, it is required to repair and till dry.

 

Q2: Is there any special requirement on the substrate concrete condition?

A: Yes, The concrete strenght must be above >C25 ;

Flatness: the maximum altitude difference of 2M running rule must be <3mm

The moisture content of the base must be <4%.

 

Q3: What is the requirement on the environment during application of epoxy floor paint?

A: 1.The temperature should be no less than 10 C;

  2.The moisture of air should be below 85%

  3.Make sure the room is well ventilated during application.

 

Q4: How many layers of epoxy paint is it in your paint system?

A: This is flexible. If your floor is new and smooth in good condition, generally 3 layers of epoxy paint would be enough;While if your floor is old with cracks,joints,holes,etc,it is suggested to apply 4 layers of epoxy paint.

 

Q5: What is the thickness after application of epoxy floor paint?

A: The general thickness is about 2mm for 4 layers.

 

Q6: How many days does it take to finish whole painting project?

A: The re-coat time of each layer is usually 8 hours, namely you can finish one layer today,and tomorrow start another layer.So if you have experienced painters, it will take no more than one week if the floor area is below 5000 sqm.

 

Q7: When can I use the newly painted floor?

A: After applying epoxy floor paint, you will need maintenance about 7~10 days, no people walk,no maching running.

 

Q8: Besides the epoxy paint,what else do I need to buy for application?

A: You will need the related tools,such as roller, trowel, grinding machine,grinding disks,electrical mixing machine,etc. We can collect all the necessary accessory tools for you

 

Q9: How many colors of epoxy paint do you have for choice?

A: We have near hundred different colors for epoxy paint. You can choose from digial color chart and Real color chart.


Related Products

Get the latest price? We will reply as soon as possible (within 2 hours)