Measuring
With gloves on, pour equal amounts of resin and hardener into a mixing cup. And then pouring the mixture into another clean mixing cup to make sure you are mixing it well. Hardener a little more than you think you'll need because you want to completely cover your work in one shot and not have to mix more later.
1.Requirements for the base:
1. Concrete strength≥C25;
2. Flatness: the maximum altitude difference of 2M running rule<3mm.
3. The moisture content of the base<4%
Technical Data of The Epoxy Paint:
Drying time | |
Touch dry: | 8-12 hours |
Hard dry: | 2 days |
Compressive strength (Mpa): | ≥85 |
Impact resistance strength (Kg•cm): | 50 |
Flexural strength (Mpa): | ≥7 |
Tensile strength (Mpa): | ≥9 |
Shore hardness: | ≥85 |
Abrasion resistance(750g/500r, CS-17, g) | ≤0.06 |
Service life: | 25years |
Application: