Advantages
1. Beautiful, seamless, dustproof and easy to clean
2.Have good bonding with the solid base, small shrinkage with good abrasion resistance and durability
3. Have good corrosion-resistance to the general chemicals.
4. Nice appearance, rapid construction and economy.
5. Applicable to the moderate load
Application instructions:
Surface preparation | Correct substrate preparation is critical for optimum performance. Surface should be sound, clean, dry and free from loose particles,oil,grease,and other contaminants. |
Primer | Prepare a barrel, pour paint and hardener Stir the mixture well and then apply it with roller or trowel. The reference consumption is 0.15kg/m².The main purpose of this primer is to seal the substrate completely and avoid air-bubbles in the body coat. A second coat may be required depending on the oil absorption condition of substrate. The recoat time is about 8 hours. |
Inspection standard for the primer: even film with certain brightness. | |
Undercoat | Mix paint and hardener then add quartz powder (1/2 of the mixture of A and B) into the mixture, stir it well and apply with trowel. The consumption quantity of A and B is 0.5kg /sqm. You can do it one coat at one time or two coats at two times. In the second case, the application interval is about 8 hours at 25 degrees. Sand the first layer, clean it and then apply the second layer. After the whole application, wait another 8 hours, grind it, clean the sanding dust and then continue the next procedure. |
Inspection standard for the undercoat: Non-sticky to hand, no softening, no nail print if you scratch the surface | |
Top coat | Mix paint and hardener and then apply the mixture with spatula. The consumption quantity is 1.0kg/sqm. |
Maintenance | 5-7 days. Don’t put the floor into use or wash it with water or other chemicals. |
Requirements for the base:
1. Concrete strength≥C25;
2. Flatness: the maximum altitude difference of 2M running rule<3mm.
3. The moisture content of the base<4%
Storage And Shelf Life
1.Store at the temperature of 25°C or cool and dry place. Avoid from sunlight, high temperature or high humidity environment.
2.Use up as soon as possible when opened. It is strictly forbidden to expose to the air for a long time after it is opened to avoid affecting the quality of the products. The shelf life is six months in the room temperature of 25°C degree.
Note:
The above information is given to the best of our knowledge based on laboratory tests and practical experience. However, since we cannot anticipate or control many conditions under which our products may be used, we can only guarantee the quality of the product itself. We reserve the right to alter the given information without prior notice.
FAQ
Q1: What should I do to the concrete floor before apply epoxy resin floor paint?
A: Before applying epoxy floor paint, be sure to make the concrete floor smooth and flat, the surface must be clean,sound hard and free from loose particles,oil,grease and other contaminants. If it is old floor with cracks,holes,joints, it is required to repair and till dry.
Q2: Is there any special requirement on the substrate concrete condition?
A: Yes, The concrete strenght must be above >C25 ;
Flatness: the maximum altitude difference of 2M running rule must be <3mm
The moisture content of the base must be <4%.
Q3: What is the requirement on the environment during application of epoxy floor paint?
A: 1.The temperature should be no less than 10 C;
2.The moisture of air should be below 85%
3.Make sure the room is well ventilated during application.
Q4: How many layers of epoxy paint is it in your paint system?
A: This is flexible. If your floor is new and smooth in good condition, generally 3 layers of epoxy paint would be enough;While if your floor is old with cracks,joints,holes,etc,it is suggested to apply 4 layers of epoxy paint.
Q5: What is the thickness after application of epoxy floor paint?
A: The general thickness is about 2mm for 4 layers.