How long does striping paint take to dry?

2024-10-07

In public transportation facilities such as roads, parking lots, and airports, striping paint is an important material used to divide areas, indicate directions, and provide safety warnings. It is crucial for construction personnel and management departments to understand the drying time of striping paint because it directly affects construction efficiency and traffic recovery time.


This article will explore the drying time of striping paint in depth from multiple aspects such as the types of striping paint, factors affecting drying time, and actual application cases.

striping paint

What types of striping paint are there?

There are many types of striping paints. According to different ingredients and uses, they can be roughly divided into hot melt striping paints, solvent-based striping paints, water-based striping paints, and two-component striping paints.


Hot melt striping paint:

This type of striping paint needs to be heated to a certain temperature during construction to make it liquid and then sprayed on the road surface. Hot melt striping paint has strong adhesion and durability, dries quickly, and usually solidifies within a few minutes.


Solvent-based striping paint:

This type of striping paint uses organic solvents as diluents, and the paint film is solidified by the volatilization of the solvent after spraying. Solvent-based stripe paint takes a relatively long time to dry, usually about 30 minutes to 1 hour.


Water-based stripe paint:

This stripe paint uses water as a diluent, is environmentally friendly, and is widely used in urban roads and parking lots. The drying time of water-based stripe paint is usually about 1 hour, but it is greatly affected by the ambient temperature and humidity.


Two-component stripe paint:

This stripe paint is cured by chemical reaction after mixing two components, and has excellent wear resistance and weather resistance. The drying time of two-component stripe paint varies depending on the formula, usually between 10 minutes and 1 hour.

Water-based stripe paint

What are the factors that affect the drying time of stripe paint?

The drying time of stripe paint is affected by many factors, including environmental conditions, paint film thickness, construction method, etc.


Environmental conditions:

● Temperature: The higher the temperature, the faster the paint film dries. High temperature can accelerate the volatilization of solvents and the progress of chemical reactions, making the paint film cure faster.

● Humidity: The higher the humidity, the slower the paint film dries. In a high humidity environment, the drying time of water-based stripe paint is particularly affected because the evaporation rate of water is slowed down.

● Wind speed: Higher wind speeds help to speed up the evaporation of solvents and water, and increase the drying speed of the paint film.


Paint film thickness:

● The thicker the paint film, the longer the drying time. Thicker paint films require more time for the solvent or water to completely evaporate, and the internal layers cure more slowly.


Construction methods:

● Spraying: The spraying process can evenly distribute the paint film and usually dries faster than brushing and rolling.

● Number of coats: When multiple layers are applied, the drying time of each layer accumulates, which will affect the overall drying time.


Paint formula:

● Stripe paints from different manufacturers have different formulas and different drying times. Some high-performance stripe paints shorten the drying time by adding driers or improving the resin composition.

types of striping paint

Practical application case analysis

By analyzing practical application cases, we can more intuitively understand the drying time of stripe paints and their influencing factors.


Urban road marking construction:

The construction team chose water-based stripe paint for the marking construction of a main road in the city center. The temperature on the day of construction was 25℃, the humidity was 60%, and the wind speed was 5 km/h. The construction team used spraying equipment to spray the markings, and the thickness of the paint film was controlled at about 0.2 mm. After the construction was completed, the stripe paint dried within 30 minutes and completely solidified within 1 hour, and the road was successfully restored to traffic.


Highway marking construction:

A highway was re-marked, and the construction team chose hot-melt stripe paint. The temperature on the day of construction was 30℃, the humidity was 50%, and the wind speed was 10 km/h. The construction team used special heating equipment to heat the stripe paint to 200℃ and then sprayed it on the road surface. The hot-melt stripe paint dried within 2 minutes and completely solidified within 5 minutes. The highway was restored to traffic in a short time, greatly improving the construction efficiency.


Parking lot marking construction:

A large shopping center underground parking lot was marked, and the construction team chose solvent-based stripe paint. The temperature on the day of construction was 20℃, the humidity was 70%, and the wind speed was 3 km/h. The construction team used a brushing process to paint the marking lines, and the thickness of the paint film was controlled at about 0.3 mm. After the construction was completed, the stripe paint dried within 40 minutes and was completely cured within 2 hours, and the parking lot was restored to use.

striping paint

How to optimize the drying time of stripe paint?

In order to optimize the drying time of stripe paint in actual construction, the following measures can be taken:

1. Select a suitable type of stripe paint

2. Control the construction environment conditions

3. Optimize the construction method

4. Use a drying agent


Select a suitable type of stripe paint:

Choose a suitable type of stripe paint according to the construction environment and usage requirements. For scenes that require rapid restoration of traffic, hot melt or two-component stripe paint can be selected; for scenes with higher environmental protection requirements, water-based stripe paint can be selected.


Control the construction environment conditions:

When possible, choose to carry out construction in an environment with suitable temperature, low humidity and moderate wind speed. By adjusting the construction time, avoid extreme weather conditions and increase the drying speed of the paint film.


Optimize the construction method:

Use the spraying process to control the thickness of the paint film and avoid the excessively thick paint film affecting the drying speed. When applying multiple layers, ensure that each layer is completely dry before applying the next layer.


Use a drying agent:

Adding a proper amount of drying agent to the stripe paint can significantly speed up the evaporation of solvents or water and shorten the drying time of the paint film.